Advanced search

Message boards : News : Simpler deadline

Author Message
Profile GDF
Volunteer moderator
Project administrator
Project developer
Project tester
Volunteer developer
Volunteer tester
Project scientist
Send message
Joined: 14 Mar 07
Posts: 1957
Credit: 629,356
RAC: 0
Level
Gly
Scientific publications
watwatwatwatwat
Message 21991 - Posted: 10 Sep 2011 | 6:47:02 UTC

Since a few days, the deadline for the results is fixed at 5 days.There is not anymore any special mechanism for replication of results as before.
This change should help people with slow cards to complete workunits.

Make sure you select the right application (short 3h or long 12h) for your card.

gdf

Profile Retvari Zoltan
Avatar
Send message
Joined: 20 Jan 09
Posts: 2355
Credit: 16,375,531,916
RAC: 3,695,757
Level
Trp
Scientific publications
watwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwat
Message 21992 - Posted: 10 Sep 2011 | 9:09:52 UTC - in response to Message 21991.
Last modified: 10 Sep 2011 | 9:10:14 UTC

I have mixed feelings about this.
While it's a good idea to have only one deadline, maybe you'll have to increase the number of workunits in the queue to avoid outages due to longer return times.
We'll see.
A special mechanism would be needed to avoid sending long workunits to slow hosts.

Profile skgiven
Volunteer moderator
Volunteer tester
Avatar
Send message
Joined: 23 Apr 09
Posts: 3968
Credit: 1,995,359,260
RAC: 0
Level
His
Scientific publications
watwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwat
Message 22080 - Posted: 12 Sep 2011 | 22:43:21 UTC - in response to Message 21992.

The deadline has been 5days for years. The difference is that GPUGrid is no longer automatically resending tasks after 3 days; which previously negated contributions from 3days+ crunchers, despite the fact that they previously did get credit.

While I respect the facilitation of a greater number of cards and crunchers, I am concerned that this encourages slowness in returning tasks and the use of non-recommended cards that may very soon (4.1; CC1.3+ only) be unusable.
My biggest concern however is the consequence of aborted or failed tasks (now that there is no automatic mechanism for reissuing such tasks).

So crunchers, please stick to the recommendations (low cache, report tasks immediately), and please do not abort tasks, so long as they will finish within 5days. If you are using a low to mid-range card, or do not contribute frequently (say 12h+ per day) stick to the normal/short tasks.

Dagorath
Send message
Joined: 16 Mar 11
Posts: 509
Credit: 179,005,236
RAC: 0
Level
Ile
Scientific publications
watwatwatwatwatwatwatwatwatwatwatwatwatwat
Message 22082 - Posted: 12 Sep 2011 | 23:30:15 UTC - in response to Message 22080.

My biggest concern however is the consequence of aborted or failed tasks (now that there is no automatic mechanism for reissuing such tasks).


I had this task fail and it was resent so I think he meant there is no longer a special mechanism to resend after 3 days. The standard resend mechanism is still operational, it seems.

Profile GDF
Volunteer moderator
Project administrator
Project developer
Project tester
Volunteer developer
Volunteer tester
Project scientist
Send message
Joined: 14 Mar 07
Posts: 1957
Credit: 629,356
RAC: 0
Level
Gly
Scientific publications
watwatwatwatwat
Message 22085 - Posted: 13 Sep 2011 | 6:57:15 UTC - in response to Message 22082.

Yes, there is no longer the special mechanism to resend after 3 days, but the other standard mechanisms are still in place.


gdf

Profile microchip
Avatar
Send message
Joined: 4 Sep 11
Posts: 110
Credit: 326,102,587
RAC: 0
Level
Asp
Scientific publications
watwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwat
Message 22105 - Posted: 14 Sep 2011 | 15:40:59 UTC - in response to Message 21991.

Since a few days, the deadline for the results is fixed at 5 days.There is not anymore any special mechanism for replication of results as before.
This change should help people with slow cards to complete workunits.

Make sure you select the right application (short 3h or long 12h) for your card.

gdf


Hi, excuse this newbie the question, but I run a GT 440 here and my very first task from GPUGRID is reported by boinc as needing 27 hours to compute. You mention to select the right application but where can I do that?

thanks :)

Profile Retvari Zoltan
Avatar
Send message
Joined: 20 Jan 09
Posts: 2355
Credit: 16,375,531,916
RAC: 3,695,757
Level
Trp
Scientific publications
watwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwat
Message 22106 - Posted: 14 Sep 2011 | 16:07:21 UTC - in response to Message 22105.
Last modified: 14 Sep 2011 | 16:07:54 UTC

Hi, excuse this newbie the question, but I run a GT 440 here and my very first task from GPUGRID is reported by boinc as needing 27 hours to compute. You mention to select the right application but where can I do that?

thanks :)

Click on "Your Account"
Look for the settings section, in the last line "Preferences for this project" click on "GPUGrid settings"
Click on "GPUGrid settings"
Uncheck the checkbox beside "ACEMD for long runs (8-12 hours on fastest GPU)"
Click on save settings.

Profile microchip
Avatar
Send message
Joined: 4 Sep 11
Posts: 110
Credit: 326,102,587
RAC: 0
Level
Asp
Scientific publications
watwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwatwat
Message 22107 - Posted: 14 Sep 2011 | 17:34:03 UTC - in response to Message 22106.

Hi, excuse this newbie the question, but I run a GT 440 here and my very first task from GPUGRID is reported by boinc as needing 27 hours to compute. You mention to select the right application but where can I do that?

thanks :)

Click on "Your Account"
Look for the settings section, in the last line "Preferences for this project" click on "GPUGrid settings"
Click on "GPUGrid settings"
Uncheck the checkbox beside "ACEMD for long runs (8-12 hours on fastest GPU)"
Click on save settings.


Thanks :D

Post to thread

Message boards : News : Simpler deadline

//