Message boards : Wish list : Big Credits for Big WU's
Author | Message |
---|---|
I recently encountered a situation where my system was processing some very large WU's from the short run side and getting very poor credit for the work done. Long run WU's of equivalent length are giving 3-4x the credit. Is there any way this can be better normalized? Or maybe just roll these large HIV units over to the long run side? The whole point to credits imo is to indicate how much work your systems have done. It would be great to be able to contribute to all subprojects and not feel that we're being shorted. | |
ID: 23108 | Rating: 0 | rate: / Reply Quote | |
The long WUs should give 2x the credits as the short ones. | |
ID: 23116 | Rating: 0 | rate: / Reply Quote | |
Message boards : Wish list : Big Credits for Big WU's