Message boards : Wish list : Longer deadlines
Author | Message |
---|---|
I get the feeling the GPUGrid is only for an exclusive club of members. I want to donate time for GPUGrid, but I think the deadline times you get is a borderline joke. | |
ID: 27972 | Rating: 0 | rate: / Reply Quote | |
There won't be longer deadlines, this research project needs fast wu returns. | |
ID: 27975 | Rating: 0 | rate: / Reply Quote | |
I did not knew they had that option. Thank you. I'll test to see if i'm able to complete those instead. | |
ID: 27978 | Rating: 0 | rate: / Reply Quote | |
you should easily be able to complete the short tasks by the deadline. | |
ID: 27979 | Rating: 0 | rate: / Reply Quote | |
Topic very, very old but I think it should be refreshed. I don't know how did it looked like 5 year ago but now Short Run task are phenomenoms. Some people haven't got ultrafast computers and don't stay them turned on 24/7 but they want to help. Mayby deadline for Long Run task would be a bit longer? I think 7 days might be okey. In fact it may accelerate work because more people would join. | |
ID: 50891 | Rating: 0 | rate: / Reply Quote | |
The deadlines are so short because each work unit runs off of the previous result, so if some people forget that they are accepting work and never complete it, it will be a very inefficient process with a longer deadline. There is always CPU work for those without a fast gpu/don't leave their computer on all the time. | |
ID: 50894 | Rating: 0 | rate: / Reply Quote | |
A don't claim that deadline should be unlimited :D But 5-day-long deadline for Long and Short Run tasks isn't fair. 7-day long deadline for Long Run tasks would give chance more people to complete their work. | |
ID: 50899 | Rating: 0 | rate: / Reply Quote | |
Topic very, very old but I think it should be refreshed. I don't know how did it looked like 5 year ago but now Short Run task are phenomenoms. Some people haven't got ultrafast computers and don't stay them turned on 24/7 but they want to help. Mayby deadline for Long Run task would be a bit longer? I think 7 days might be okey. In fact it may accelerate work because more people would join.It was more balanced between the short and the long workunits before. The purpose of the short queue is to make the owners of slower GPUs to be able to contribute. It's too bad, that the project does not have that much work to feed both queues with sufficient number of workunits. It wouldn't accelerate the work if more people joined with slower cards: 1. This project needs fast turnaround times, as the workunits pick up on the point where the previous one had finished. So extending the deadline would mean that the whole chain of workunits would take significantly longer. Other projects work the opposite way: their workunits are independent from each other, so extending the deadline does not increase the completion time of the whole batch. 2. Years ago, the deadline was 5 days, but after 2 days the work was sent to another host too (so the 1st one may work in vain). So practically the deadline was 2 days, while the BOINC manager (and the user) thought it was 5 days. This caused much frustration, and it had been corrected long ago (by eliminating the reissue after 2 days). But as you can see from this earlier practice this project would be better off by a 2 day deadline. | |
ID: 50900 | Rating: 0 | rate: / Reply Quote | |
A don't claim that deadline should be unlimited :D But 5-day-long deadline for Long and Short Run tasks isn't fair. If your logic isn't to have unlimited deadlines, it's certainly to bend the rules to fit your systems' specs. This messes with every one else's setup, and does not benefit the project. If your setup is not able to contribute, move on. You will get another chance. In the mean time QC has a full queue and doesn't even require a GPU. | |
ID: 50901 | Rating: 0 | rate: / Reply Quote | |
QC doesn't need GPU but needs much of disk space. And I don't want to band rules, I think only that they aren't perfect. Is it something bad? | |
ID: 50904 | Rating: 0 | rate: / Reply Quote | |
I also need longer deadline as my computer does not run 24/7. | |
ID: 61823 | Rating: 0 | rate: / Reply Quote | |
No, nothing can be done on your end except choose work units with smaller runtimes. Some of the Quantum Chemistry WU's can be run in 1-4 hours on fast gpus. | |
ID: 61825 | Rating: 0 | rate: / Reply Quote | |
I've got a small graphics card (NVIDIA GeForce 1030) and I'd like to contribute. It's old but I can run it all day. I definitely can't complete ATMML in the required time! So I've deselected that and ACEMD 3, but do you think I can leave ATM and Quantum Chemistry enabled? | |
ID: 61944 | Rating: 0 | rate: / Reply Quote | |
You 1030 is too weak and doesn't have enough VRAM to compute the short running Quantum Chemistry tasks. You might be able to run the ATM tasks but I haven't seen those tasks in over a year. Only the current ATMML tasks are available currently. | |
ID: 61945 | Rating: 0 | rate: / Reply Quote | |
Ok, well thanks for letting me know, I think I can still use it for foldingathome units, and in future I'm sure I'll upgrade and use a newer card for GPUGRID. | |
ID: 61946 | Rating: 0 | rate: / Reply Quote | |
Message boards : Wish list : Longer deadlines